Surveying The solar tidal force divided by lunar tidal force is 5/4 1/3 1/2 3/4 5/4 1/3 1/2 3/4 ANSWER DOWNLOAD EXAMIANS APP
Surveying The point on the photograph where bisector between the vertical line through optical centre of the camera lens and the plate perpendicular meets, is known as Perspective centre Isocenter Principal point Plumb point Perspective centre Isocenter Principal point Plumb point ANSWER DOWNLOAD EXAMIANS APP
Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are (i) Levelling (ii) Orientation (iii) CenteringThe correct sequence of these operations is (i), (ii), (iii) (ii), (iii), (i) (i), (iii), (ii) (iii), (i), (ii) (i), (ii), (iii) (ii), (iii), (i) (i), (iii), (ii) (iii), (i), (ii) ANSWER DOWNLOAD EXAMIANS APP
Surveying At western elongation, the pole star moves Southward Westward Eastward Northward Southward Westward Eastward Northward ANSWER DOWNLOAD EXAMIANS APP
Surveying The plane at right angle to the zenith-nadir line and passing through the centre of the earth, is called Rational horizon True horizon All of these Celestial horizon Rational horizon True horizon All of these Celestial horizon ANSWER DOWNLOAD EXAMIANS APP
Surveying Detailed plotting is generally done by All of these resection radiation traversing All of these resection radiation traversing ANSWER DOWNLOAD EXAMIANS APP