Power Systems The positive sequence reactance will be equal to negative sequence if the equipment is transformer and transmission lines. none of these. motor. generator. transformer and transmission lines. none of these. motor. generator. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the total installed power capacity (MW) in West Bengal as published by ministry of power in 2011? 10000.32. 6114.05. 15515.22. 8113.27. 10000.32. 6114.05. 15515.22. 8113.27. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A steam power generation has an overall efficiency of 20 %. 0.6 Kg of coal is burnt per kWh of electrical energy generated. Calculated the calorific value of fuel 7000 KCal / Kg. 7562 KCal / Kg. 7166.67 KCal / Kg. 7268.45 KCal / Kg. 7000 KCal / Kg. 7562 KCal / Kg. 7166.67 KCal / Kg. 7268.45 KCal / Kg. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is a reaction turbines None of these. Francis turbine and Kaplan turbine. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. None of these. Francis turbine and Kaplan turbine. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Earthing switch is used for measuring of safety voltage All of these discharging residual energies protection of equipment from ground faults measuring of safety voltage All of these discharging residual energies protection of equipment from ground faults ANSWER DOWNLOAD EXAMIANS APP
Power Systems IF the time of operation of a relay for unity TMS is 10 sec then the time of operation for 0.5 TMS is 20 sec. 5 sec. none of these. 10 sec. 20 sec. 5 sec. none of these. 10 sec. ANSWER DOWNLOAD EXAMIANS APP