Power Systems The positive sequence reactance will be equal to negative sequence if the equipment is transformer and transmission lines. generator. motor. none of these. transformer and transmission lines. generator. motor. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems ACSR means Aluminium core steel reinforced all conductor steel reinforced Aluminium conductor steel reinforced Aluminium copper steel reinforced Aluminium core steel reinforced all conductor steel reinforced Aluminium conductor steel reinforced Aluminium copper steel reinforced ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge tank is kept very close to the generator turbine spill way pen stock generator turbine spill way pen stock ANSWER DOWNLOAD EXAMIANS APP
Power Systems A moderator material should have None of these may be any of the above. small atomic mass. large atomic mass. None of these may be any of the above. small atomic mass. large atomic mass. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a line is increased by which of the following compensation methods? shunt reactor series capacitor shunt capacitor both 1 and 2 shunt reactor series capacitor shunt capacitor both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating time of pumped storage plant is high very high low can't say high very high low can't say ANSWER DOWNLOAD EXAMIANS APP