The positive and negative sequence impedance of a transmission line are

Infinite
Equal
Different
Zero

ANSWER DOWNLOAD EXAMIANS APP

DGVCL Exam Paper (11-12-2011)
Permittivity is expressed in terms of

Weber /m
farad/sq. m.
Farad/m
N/m

ANSWER DOWNLOAD EXAMIANS APP

DGVCL Exam Paper (11-12-2011)
The mutual inductance between two unity coupled coils of 9 H and 4 H is

36 H
2.2 H
6 H
13 H

ANSWER DOWNLOAD EXAMIANS APP

DGVCL Exam Paper (11-12-2011)
Which type of back up protection is widely used for the protection of transmission lines?

Control backup
Breaker backup
Remote backup
Relay backup

ANSWER DOWNLOAD EXAMIANS APP

DGVCL Exam Paper (11-12-2011)
The efficiency of a transformer at full load, 0.8 p.f. lag is 90%. Its efficiency at full load, 0.8 p.f. lead will be

90 %
More than 90%
80 %
Less than 90%

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

Efficiency= output power/input power
efficiency = (v*i*cosφ)/((v*i*cosφ)+(x² Pc)+(Pi)) x=fractional part of full load

DGVCL Exam Paper (11-12-2011)
The insulation coordination for UHV lines (above 500 kV) is done based on

Lightning and switching surges
Lightning surges
Voltage level of the line
Switching surges

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON DGVCL Exam Paper (11-12-2011)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑