Surveying The permissible error in chaining for measurement with chain on rough or hilly ground is 1 in 100 1 in 1000 1 in 250 1 in 500 1 in 100 1 in 1000 1 in 250 1 in 500 ANSWER DOWNLOAD EXAMIANS APP
Surveying The negative sign is assigned to Reduction to mean sea level Correction for horizontal alignment All listed here Correction for slope Reduction to mean sea level Correction for horizontal alignment All listed here Correction for slope ANSWER DOWNLOAD EXAMIANS APP
Surveying At the first point of Aeries, the sun moves Southward From north to south of the equator Northward From south to north of the equator Southward From north to south of the equator Northward From south to north of the equator ANSWER DOWNLOAD EXAMIANS APP
Surveying G.M.T. corresponding to given mean time, equals L.M.T. - East longitude in time None of these L.M.T. + East longitude in time L.M.T. - West longitude in time L.M.T. - East longitude in time None of these L.M.T. + East longitude in time L.M.T. - West longitude in time ANSWER DOWNLOAD EXAMIANS APP
Surveying The difference in longitude of two places expressed in time is equal to the difference in their Apparent solar time Mean solar time All listed here Sidereal time Apparent solar time Mean solar time All listed here Sidereal time ANSWER DOWNLOAD EXAMIANS APP
Surveying Check lines (or proof lines) in Chain Surveying, are essentially required To plot the chain lines To indicate the accuracy of the survey work To plot the offsets To increase the out-turn To plot the chain lines To indicate the accuracy of the survey work To plot the offsets To increase the out-turn ANSWER DOWNLOAD EXAMIANS APP