Irrigation Engineering The net head under which the turbine reaches its peak efficiency at synchronous speed is called design head gross head rated head operating head design head gross head rated head operating head ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A water-logged land is found suitable for cultivation due to Absence of aeration of soil from root zone of the plant None of these Ease of tillage for preparation of the field for optimum condition of germination Regular supply of water to plants from the water table by capillary action Absence of aeration of soil from root zone of the plant None of these Ease of tillage for preparation of the field for optimum condition of germination Regular supply of water to plants from the water table by capillary action ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering An outlet is said to be proportional if its flexibility, is More than one Less than one One Zero More than one Less than one One Zero ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If 4 cm 6.0 cm 4.5 cm 5 cm 4 cm 6.0 cm 4.5 cm 5 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 60 minutes 30 minutes 15 minutes 20 minutes 60 minutes 30 minutes 15 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A land is known as waterlogged when gravity drainage has ceased capillary fringe reaches the root zone of plants when the permanent wilting point is reached None of these when gravity drainage has ceased capillary fringe reaches the root zone of plants when the permanent wilting point is reached None of these ANSWER DOWNLOAD EXAMIANS APP