Irrigation Engineering The net head under which the turbine reaches its peak efficiency at synchronous speed is called gross head operating head rated head design head gross head operating head rated head design head ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Tortuosity of a meandering river is always less than 1 greater than 1 less than or equal to 1 equal to 1 less than 1 greater than 1 less than or equal to 1 equal to 1 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Silt excluders are constructed on the river bed upstream of head regulator river bed downstream of head regulator canal bed upstream of head regulator canal bed downstream of head regulator river bed upstream of head regulator river bed downstream of head regulator canal bed upstream of head regulator canal bed downstream of head regulator ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In case of a trapezoidal notch fall Splay upstream from the notch section is 45° Top length of the piers should not be less than their thickness All listed here Splay downstream from the notch section is 22½° Splay upstream from the notch section is 45° Top length of the piers should not be less than their thickness All listed here Splay downstream from the notch section is 22½° ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Unit of runoff in M.K.S. system is square metre cubic metre metre/sec cubic metre/sec square metre cubic metre metre/sec cubic metre/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the rate of change of discharge of an outlet and parent channel, is known as Sensitivity Efficiency Modular limit Flexibility Sensitivity Efficiency Modular limit Flexibility ANSWER DOWNLOAD EXAMIANS APP