Irrigation Engineering Seepage through foundation in an earthen dam is controlled by providing horizontal blanket impervious cut off chimney drain rock toe horizontal blanket impervious cut off chimney drain rock toe ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For standing crops in undulating sandy fields, the best method of irrigation, is Sprinkler irrigation Free flooding Furrow method Check method Sprinkler irrigation Free flooding Furrow method Check method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Bed bars in a canal are provided To watch the general behavior of canal To raise the supply level To control the silting To measure the discharge To watch the general behavior of canal To raise the supply level To control the silting To measure the discharge ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.) 1.50 hw 1.25 hw 0.5 hw 0.75 hw 1.50 hw 1.25 hw 0.5 hw 0.75 hw ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If H and d are the water depth and drop in the bed level at a Sarda fall, the width B of the trapezoidal crest, is given by B = 0.44 √(H + d) B = 0.55 √(H + d) B = 0.22 √(H + d) B = 0.33 √(H + d) B = 0.44 √(H + d) B = 0.55 √(H + d) B = 0.22 √(H + d) B = 0.33 √(H + d) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hydroelectric scheme operating under a head of 80 m will be classified as high head scheme medium head scheme None of these low head scheme high head scheme medium head scheme None of these low head scheme ANSWER DOWNLOAD EXAMIANS APP