• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Irrigation Engineering

Irrigation Engineering
In a barrage, the crest level is kept

Low with no gates
High with large gates
Low with large gates
High with no gates

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
The ratio of the discharge over a trapezoidal crest to a rectangular crest of Sarda falls of identical parameters, is

1.054
1.074
1.084
1.064

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be

aqueduct
superpassage
syphon
syphon aqueduct

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Side slopes generally kept for canals in loam soil, are:

1½ : 1 in cutting and 2 : 1 in filling
Neither (A) nor (B)
1 : 1 in cutting and 1½ : 1 in filling
Both (A) and (B)

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be

637 hectares/m3/sec
972 hectares/m3/sec
837 hectares/m3/sec
1172 hectares/m3/sec

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
The crest level of a canal diversion head work, depends upon

All listed here
F.S.L. of the canal
Discharge perimeters
Pond level

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Irrigation Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑