Irrigation Engineering In a barrage, the crest level is kept Low with no gates High with large gates Low with large gates High with no gates Low with no gates High with large gates Low with large gates High with no gates ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the discharge over a trapezoidal crest to a rectangular crest of Sarda falls of identical parameters, is 1.054 1.074 1.084 1.064 1.054 1.074 1.084 1.064 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be aqueduct superpassage syphon syphon aqueduct aqueduct superpassage syphon syphon aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Side slopes generally kept for canals in loam soil, are: 1½ : 1 in cutting and 2 : 1 in filling Neither (A) nor (B) 1 : 1 in cutting and 1½ : 1 in filling Both (A) and (B) 1½ : 1 in cutting and 2 : 1 in filling Neither (A) nor (B) 1 : 1 in cutting and 1½ : 1 in filling Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be 637 hectares/m3/sec 972 hectares/m3/sec 837 hectares/m3/sec 1172 hectares/m3/sec 637 hectares/m3/sec 972 hectares/m3/sec 837 hectares/m3/sec 1172 hectares/m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The crest level of a canal diversion head work, depends upon All listed here F.S.L. of the canal Discharge perimeters Pond level All listed here F.S.L. of the canal Discharge perimeters Pond level ANSWER DOWNLOAD EXAMIANS APP