Docks and Harbor Engineering The minimum diameter of turning besin, where ships turn by going ahead and without tug assistance should be 1 L 4.0 L 1.5 L 2.0 L 1 L 4.0 L 1.5 L 2.0 L ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Large size stones are required in stone revetment in shore protection.Reason R : Resistance of stone to wave force is proportional to its volume and wave force is proportional to the exposed area of the stone.Select your answer based on the coding system given below. Both A and R are true but R is not a correct explanation of A is true but R is false. Both A and R are true and R is the correct explanation of A is false but R is true. Both A and R are true but R is not a correct explanation of A is true but R is false. Both A and R are true and R is the correct explanation of A is false but R is true. ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Intervention of undulations in the sea bed reduces the depth of wave at the section.Reason R : No wave can have a height greater than the depth of water through which it passes.Select your answer based on the coding system given below: A is false but R is true. A is true but R is false. Both A and R are true but R is not the correct explanation of A. Both A and R are true and R is correct explanation of A. A is false but R is true. A is true but R is false. Both A and R are true but R is not the correct explanation of A. Both A and R are true and R is correct explanation of A. ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Consider the following statements in regard to Beaufort scale for wind speeds,(i) The Beaufort number ranges from 1 to 12.(ii) Higher Beaufort number indicates higher speed of wind,(iii) Beaufort number for calm is smallest and for hurricane is highest of these statements (i), (ii) and (iii) are correct (i) and (iii) are correct (ii) and (iii) are correct (i) and (ii) are correct (i), (ii) and (iii) are correct (i) and (iii) are correct (ii) and (iii) are correct (i) and (ii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area? Sea walls, revetments and groynes Sea walls, bulk heads and groynes Sea walls, bulk heads and revetments Bulk heads, revetments and groynes Sea walls, revetments and groynes Sea walls, bulk heads and groynes Sea walls, bulk heads and revetments Bulk heads, revetments and groynes ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering At a given port, the fetch is 400 nautical miles, the maximum height of storm wave will be 2.073 m 8.169 m 6.8 m 9.144 m 2.073 m 8.169 m 6.8 m 9.144 m ANSWER DOWNLOAD EXAMIANS APP