Indian Electricity Rules specify that the maximum load on a power sub-circuit should not exceed 3000 watts and the number of outlets should be limited to two.
Average speed:- The distance covered between two stops divided by the actual time of the run is known as average speed. Average speed = (Distance between stops)/(Actual time of run) Schedule speed:- It is defined as the ratio of distance covered between two stops and the total time of run including the time of the stop. Schedule speed = (Distance between stops) /(Actual time of run + Stop time) This shows that schedule speed is always smaller than the average speed. The difference is large in the case of urban and suburban services and is negligibly small in the case of main-line service.
The combined inductance of two coils connected in series L = L1 + L2 + 2M In series adding case L1 + L2 + 2M = 0.6 H ——–(1) In series opposing case L1 + L2 − 2M = 0.1 H ——–(2) Subtracting eqn (2) from eqn (1) we get 4M = 0.5 H M = 0.125 H Let L1 = 0.2 H (since the coil when isolated, its self-inductance is 0.2 H) Putting the value of M & L1 in equation (2) 0.2 + L2 + 2 ×0.125 = 0.06 0.2 + L2 = 0.35 L2 = 0.15 H
Condenser – Condenser is a heat exchanger in which cooling water is circulated through the tubes. The exhaust steam from the turbine enters the condenser where it is cooled and converted to condensate (water).
While estimating the overhead lines, the first and last pole is always earth connected and after every 3rd electrical pole, the fourth pole is earthed. Therefore, the approximate number of required ground set = 4