While estimating the overhead lines, the first and last pole is always earth connected and after every 3rd electrical pole, the fourth pole is earthed. Therefore, the approximate number of required ground set = 4
A phase sequence is an order or sequence in which the currents or voltages of different phases attain their maximum values. In a three-phase system, there are only two possible phase sequences: R-Y-B (positive Phase Sequence) and R-B-Y (Negative Phase Sequence).
In nuclear power plant the graphite is used as a moderator. The job of the moderator is to absorb some of the kinetic energy of the neutrons to slow them down. This is because slow neutrons are more easily absorbed by uranium-235. A neutron slowed In this way can start the fission process.
When the field winding is connected in series with the armature winding while supplying the load then the generator is called a series generator. Current Relations As all armature, field, and load are in series they carry the same current. IL = Ise = Ia