SSC JE Electrical 2019 with solution SET-2
During the ______ period the power supply to the motor is cut-off and the train is allowed to run due to its own momentum?

Notching up
Coasting
Free running
Braking

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

SSC JE Electrical 2019 with solution SET-2
While estimating domestic wiring cost, if the length of the PVC conduit required is 62 meters, then what is the length of the cable required?

62 meters
100 meters
186 meters
124 meters

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

SSC JE Electrical 2019 with solution SET-2
The scheduled speed of a train is______

Always greater than the average speed
Always less than the average speed
Equal to maximum speed
Equal to average speed

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP