GETCO Exam Paper (11-06-2017) The efficiency of a nuclear power plant is less than that of a conventional fuel fired thermal plant because of higher pressure conditions higher temperature conditions low temperature and pressure conditions less rejection of heat in the condenser higher pressure conditions higher temperature conditions low temperature and pressure conditions less rejection of heat in the condenser ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a 3-phase, 4-wire cable the cross sectional area of neutral conductor is 1.5 times the area of phase conductor equal to the area of phase conductor double the area of phase conductor half of the area of phase conductor 1.5 times the area of phase conductor equal to the area of phase conductor double the area of phase conductor half of the area of phase conductor ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Answer as per answer key provided is “double the area of phase conductor”. But neutral wire can be half of phase.
GETCO Exam Paper (11-06-2017) What is the India's rank in the 2017 Global Peace index as per global think tank institute for economics and peace (IEP)? 155th 133rd 137th 141st 155th 133rd 137th 141st ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) A power system needs injection of VARs at both peak and off-peak load peak load full load off-peak load both peak and off-peak load peak load full load off-peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Sorry, she can't come to the phone. She _____a bath have has having is having have has having is having ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Current rating is not necessary in case of circuit breakers and load break switches circuit breakers isolators load break switches circuit breakers and load break switches circuit breakers isolators load break switches ANSWER DOWNLOAD EXAMIANS APP