GETCO Exam Paper (11-06-2017) The efficiency of a nuclear power plant is less than that of a conventional fuel fired thermal plant because of low temperature and pressure conditions less rejection of heat in the condenser higher temperature conditions higher pressure conditions low temperature and pressure conditions less rejection of heat in the condenser higher temperature conditions higher pressure conditions ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The voltage across the various discs of a string of suspension insulators having identical discs is different due to series capacitance surface leakage currents shunt capacitance to ground series and shunt capacitance series capacitance surface leakage currents shunt capacitance to ground series and shunt capacitance ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) As the size of a thermal generating unit increases, the capital cost per kW of installed capacity may increase of decrease decreases increases remain the same may increase of decrease decreases increases remain the same ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) If the length of a cable is doubled, its capacitance becomes one half becomes double becomes one-fourth remains unchanged becomes one half becomes double becomes one-fourth remains unchanged ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Current rating is not necessary in case of load break switches circuit breakers and load break switches isolators circuit breakers load break switches circuit breakers and load break switches isolators circuit breakers ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Water hammer occurs in penstock draft tube surge tank turbine casing penstock draft tube surge tank turbine casing ANSWER DOWNLOAD EXAMIANS APP