GETCO Exam Paper (11-06-2017) Give synonym: Cancel Approve Abolish Allow Break Approve Abolish Allow Break ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The current through series RLC circuit under resonance condition will be V/XL V/R V/XC none V/XL V/R V/XC none ANSWER EXPLANATION DOWNLOAD EXAMIANS APP For series resonace circuit,Z = RI = ImaxI = V/Z = V/R
GETCO Exam Paper (11-06-2017) By increasing the transmission voltage to double of its original value the same power can be dispatched half the original value equal to original value one fourth of original value double the original value half the original value equal to original value one fourth of original value double the original value ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The most common type of fault is three phase to ground single phase to ground two phase to ground phase-to-phase three phase to ground single phase to ground two phase to ground phase-to-phase ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The efficiency of a nuclear power plant is less than that of a conventional fuel fired thermal plant because of higher pressure conditions low temperature and pressure conditions less rejection of heat in the condenser higher temperature conditions higher pressure conditions low temperature and pressure conditions less rejection of heat in the condenser higher temperature conditions ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The most accurate and versatile method of achieving power compensation is by using saturable reactor with capacitor bank switched capacitors switched capacitor with controlled reactors fixed capacitor with controlled reactor saturable reactor with capacitor bank switched capacitors switched capacitor with controlled reactors fixed capacitor with controlled reactor ANSWER DOWNLOAD EXAMIANS APP