GETCO Exam Paper (11-06-2017) A power system needs injection of VARs at off-peak load peak load both peak and off-peak load full load off-peak load peak load both peak and off-peak load full load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Give synonym: Cease Begin Dull Create Stop Begin Dull Create Stop ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The injection of VARs is required to compensate for line losses increase the voltage at the receiving end all get a good voltage profile compensate for line losses increase the voltage at the receiving end all get a good voltage profile ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Back to back HVDC is used to reduce voltage drop provide stable interconnection decrease line losse increase the transmission capability reduce voltage drop provide stable interconnection decrease line losse increase the transmission capability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Which of the following relays is used on long transmission lines? Mho's relay Reactance relay Impedance relay None Mho's relay Reactance relay Impedance relay None ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) A circuit component that opposes the change in circuit voltage is all inductance resistance capacitance all inductance resistance capacitance ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Capacitor : Oppose change in voltageInductor : Oppose change in currentResistance : Oppose flow of current