GETCO Exam Paper (11-06-2017) A power system needs injection of VARs at full load both peak and off-peak load peak load off-peak load full load both peak and off-peak load peak load off-peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Burden of a protective relay is the power developed by the relay circuit required to operate the circuit breaker absorbed by the circuit of relay none developed by the relay circuit required to operate the circuit breaker absorbed by the circuit of relay none ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Powe system stability is least affected by input torque reactance of transmission line losses reactance of generator input torque reactance of transmission line losses reactance of generator ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Person who does not believe in the existence of God Fanatic Atheist Theist Heretic Fanatic Atheist Theist Heretic ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The efficiency of a nuclear power plant is less than that of a conventional fuel fired thermal plant because of higher pressure conditions low temperature and pressure conditions higher temperature conditions less rejection of heat in the condenser higher pressure conditions low temperature and pressure conditions higher temperature conditions less rejection of heat in the condenser ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Who was known as iron man of India? Subhash Chandra Bose Sardar Vallabhbhai Patel Govind Ballabh Pant Jawaharlal Nehru Subhash Chandra Bose Sardar Vallabhbhai Patel Govind Ballabh Pant Jawaharlal Nehru ANSWER DOWNLOAD EXAMIANS APP