Industrial Engineering and Production Management The deductions for, employees provident fund start After 240 days of joining the service After 60 days of joining the service Immediately on joining the service After 100 days of joining the service After 240 days of joining the service After 60 days of joining the service Immediately on joining the service After 100 days of joining the service ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.84 0.5 0.95 0.66 0.84 0.5 0.95 0.66 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Replacement studies are made on the following basis Rate of return method Total life average method Annual cost method Any one of the above Rate of return method Total life average method Annual cost method Any one of the above ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used All of these For checking the relative values of various layouts Where processes require the operator to be moved from one place to another When a group of workers are working at a place All of these For checking the relative values of various layouts Where processes require the operator to be moved from one place to another When a group of workers are working at a place ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be 2 HA 1.15 HA 1.5 HA 1.33 HA 2 HA 1.15 HA 1.5 HA 1.33 HA ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called Portable elevator Jib crane Hoist Chain conveyor Portable elevator Jib crane Hoist Chain conveyor ANSWER DOWNLOAD EXAMIANS APP