• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Control Systems

Control Systems
The compensator would provide a maximum phase shift of

 20o.
 60o.
 45o.
 30o.

ANSWER DOWNLOAD EXAMIANS APP

Control Systems
Find the angles of asymptotes of the open loop transfer function G(s) = k(s + 1)/((s(s+2)(s+4)?

 60°,240°
 0°, 180°
 90°,180°
 90°,270°

ANSWER DOWNLOAD EXAMIANS APP

Control Systems
Which of the following is/are represents the lag compensator?

 both 1 and 2
 (s+2)/(s+1)
 (s+2)/(s+5)
 (s+5)/(s+6)

ANSWER DOWNLOAD EXAMIANS APP

Control Systems
Transient response is improved in case of

 lead network.
 lag network.
 none of these.
 both A and B.

ANSWER DOWNLOAD EXAMIANS APP

Control Systems
The system function N(s) = V(s)/I(s) = (s+3)/(4s+5). The system is initially at rest. If the excitation i(t) is a unit step, which of the following is the initial value?

 3/9
 3/5
 1/4
 0

ANSWER DOWNLOAD EXAMIANS APP

Control Systems
Time taken for the response to rise from zero to 100 % for very first time is called

 Settling time.
 Rise time.
 Peak time.
 Delay time.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Control Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑