MGVCL Exam Paper (30-07-2021 Shift 2)
Rearrange the following to form a meaningful sentence and find the most logical order from the given options. P: dancers make the company Q: and they do not have R: a big team of professional S: a ‘guru shishya’ hierarchy
At no load the solar cell will be operating in open circuit condition. If there is internal shunting resistance it will slightly load the solar cell. This shunt resistance must be high enough such that it will not cause an appreciable loss of the photo voltaic power.
India ranked 4^th in the Global Wind Power Installed Capacity index with cumulative installed wind power generation capacity of 25088. Wind power generation capacity in India has significantly increased in recent years. As of 28 February 2021, the total installed wind power capacity was 38.789 GW, the fourth largest installed wind power capacity in the world.