Which one of the following statement with respect to Aerial Bunched Cables (ABC) system is TRUE?

ABC system requires more clearance, insulators and high maintenance.
The overall cost of the ABC system is very high as compared to the bare conductor system.
ABC system totally eliminates the fault on lines and thereby improving the quality of supply.
ABC system is not suitable for rural electrification which are situated in difficult terrain, hills, forests and coastal areas.

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
A three-phase, 12 kV, 50 Hz and 300 kW load is operating at 0.8 pf lag. If the pf is to be improved to unity, using star connected capacitor, the per phase value of the reactive VAR required is:

75 kVAR
100 kVAR
50 kVAR
25 kVAR

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In a single phase energy meter, the shunt electromagnet is energized by a ____of ____

current coil, thin wire of more turns
pressure coil, thick wire of few turns
current coil, thick wire of few turns
pressure coil, thin wire of more turns

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP