Engineering Economics Pick up the main purpose of project cost control from the following: To promote cost consciousness To signal immediate warning of uneconomic operations All of these To provide a feed back to the estimator To promote cost consciousness To signal immediate warning of uneconomic operations All of these To provide a feed back to the estimator ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics In a cash-flow diagram: Time 1 is considered to be the end of time period 1 Time 0 is considered to be the present A vertical arrow pointing up indicates a positive cash flow All of these Time 1 is considered to be the end of time period 1 Time 0 is considered to be the present A vertical arrow pointing up indicates a positive cash flow All of these ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What is a secondary book of accounts, the information of which is obtained from the journal is called? Balanced sheet Ledger Trial balance Worksheet Balanced sheet Ledger Trial balance Worksheet ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What is another term for “acid-test ratio”? Price-earnings ratio Profit margin ratio Quick ratio Current ratio Price-earnings ratio Profit margin ratio Quick ratio Current ratio ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics In what method of computing depreciation where it assumes that the annual cost of depreciation is a fixed percentage of the book value at the beginning of the year? Straight line method Sum-of-year digit method Sinking fund method Declining balance method Straight line method Sum-of-year digit method Sinking fund method Declining balance method ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics A construction estimate is used To produce a statement of the approximate cost None of these To decide an approximation of the value of the project and not the exact cost To judge tentatively or approximate value of the project To produce a statement of the approximate cost None of these To decide an approximation of the value of the project and not the exact cost To judge tentatively or approximate value of the project ANSWER DOWNLOAD EXAMIANS APP