Process Equipment and Plant Design Overall mass transfer co-efficient in case of absorption of __________ in water is based on the gas film co-efficient only, as the mass transfer process is gas film (phase) controlling. CO₂ None of these SO₂ NH₃ CO₂ None of these SO₂ NH₃ ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The LMTD correction factor (FT) is defined as the Differenced of true temperature difference and the LMTD Ratio of LMTD to the true temperature difference Ratio of true temperature difference to the LMTD Geometric mean of the true temperature difference and the LMTD Differenced of true temperature difference and the LMTD Ratio of LMTD to the true temperature difference Ratio of true temperature difference to the LMTD Geometric mean of the true temperature difference and the LMTD ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following factors determine the amount of entrainment in a distillation column? Depth of liquid above the bubble cap slots Plate spacing All of these Vapour velocity in the volume between the plates Depth of liquid above the bubble cap slots Plate spacing All of these Vapour velocity in the volume between the plates ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Le/D for a Tee (used as elbow, entering branch) would be Less than that for Tee (used as elbow, entering run) More than that for Tee (used as elbow, entering run) Around 90 Both B and C Less than that for Tee (used as elbow, entering run) More than that for Tee (used as elbow, entering run) Around 90 Both B and C ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Compensation against openings in process vessels for giving inlet and outlet connections, for providing sight glasses and manholes etc. is provided for strength and rigidity. The most efficient type of compensation is of __________ type. Fluid in Ring plate Nozzle or rim Flared out Fluid in Ring plate Nozzle or rim Flared out ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Hazards associated with the relief valve leakage for extremely hazardous material storage can be taken care of by providing Dikes Rupture diaphragm Surge chamber None of these Dikes Rupture diaphragm Surge chamber None of these ANSWER DOWNLOAD EXAMIANS APP