Power Systems On what factors does the selection of a water turbine depend Working head. Nature of load. Speed. All of above. Working head. Nature of load. Speed. All of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Nuclear power station. Power station. Thermal power station. Pumped storage. Nuclear power station. Power station. Thermal power station. Pumped storage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The per unit impedance Z(pu) is given by ZΩ* (MVA)b/((KV)²b *100) ZΩ* (kVA)b/(KV)²b ZΩ* (MVA)b/(KV)²b ZΩ* (MVA)b*100/(KV)²b ZΩ* (MVA)b/((KV)²b *100) ZΩ* (kVA)b/(KV)²b ZΩ* (MVA)b/(KV)²b ZΩ* (MVA)b*100/(KV)²b ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is/are more reliable? Gauss-Siedel (GS) method Newton Raphson (NR) method All of these Fast Decoupled Load Flow (FDLF) method Gauss-Siedel (GS) method Newton Raphson (NR) method All of these Fast Decoupled Load Flow (FDLF) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station supplies the peak load of 50 MW, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55 the maximum demand on the station and average load respectively will be 52 MW. 57.5 MW. 51.61 MW. 53 MW. 52 MW. 57.5 MW. 51.61 MW. 53 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is LG LL LLG LLL LG LL LLG LLL ANSWER DOWNLOAD EXAMIANS APP