MGVCL Exam Paper (30-07-2021 Shift 1)
Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 15 Ω and the resistance of the resistor connected to the sound core was 45 Ω. Calculate the distance of the fault point from the test end.
The second generation of smart meters are known as SMETS 2. Full form of SMET is Smart Metering Equipment Technical Specifications. It is with the previous generation known as SMETS 1. SMETS 2 smart meters were introduced in 2018.
A grid-interactive photovoltaic (PV) system uses solar energy to generate renewable power that charges batteries for use during power failures and feeds power into the electricity grid. Grid-interactive systems are based on their grid-tied and off-grid counterparts.