MGVCL Exam Paper (30-07-2021 Shift 1)
Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 15 Ω and the resistance of the resistor connected to the sound core was 45 Ω. Calculate the distance of the fault point from the test end.
Bus Type - Known Parameter - Unknown Parameter Load Bus -P, Q - V, phase angle Generator Bus - P, V (magnitude) - Q, Voltage phase angle Slack Bus Voltage - magnitude and phase angle - P, Q
The electrostatic stress in a cable is not uniformly distributed. The potential gradient is inversely proportional to the distance from the centre of the cable. Hence, it will be maximum (gmax) at the surface of the conductor and goes on decreasing until it becomes minimum (gmin) at the surface of the sheath. That means electrostatic stress in the dielectric of a cable is maximum at the surface of the conductor and minimum at the surface of the sheath.
Tank - Name of power station - capacity 1 - Vindhyachal Thermal Power Station - 4,760MW. 2 - Mundra Thermal Power Station - 4620 MW 3 - The Sasan Ultra Mega power plant - 3960 MW 4 - The Tiroda thermal power plant - 3300 MW