Irrigation Engineering Meandering of a river generally occurs, in Delta stage Rocky stage Trough stage Boulder stage Delta stage Rocky stage Trough stage Boulder stage ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For supplying water to rabi crop, kharif crop and sugarcane, the channel is designed for a capacity equal to the greater of the water requirement of rabi and kharif or sugarcane rabi or kharif rabi or kharif or sugarcane rabi and sugarcane or kharif and sugarcane rabi and kharif or sugarcane rabi or kharif rabi or kharif or sugarcane rabi and sugarcane or kharif and sugarcane ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Unit of runoff in M.K.S. system is metre/sec square metre cubic metre/sec cubic metre metre/sec square metre cubic metre/sec cubic metre ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be syphon aqueduct aqueduct superpassage syphon syphon aqueduct aqueduct superpassage syphon ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the irrigation efficiency is 80%, conveyance losses are 20% and the actual depth of watering is 16 cm, the depth of water required at the canal outlet, is 20 cm 15 cm 10 cm 25 cm 20 cm 15 cm 10 cm 25 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For a proportional outlet, the flexibility is between zero and 1 greater than 1 1 zero between zero and 1 greater than 1 1 zero ANSWER DOWNLOAD EXAMIANS APP