Irrigation Engineering Finally formed berms in canals are provided for All of these Protection of banks erosion by the waves Strengthening of banks Control of seepage losses All of these Protection of banks erosion by the waves Strengthening of banks Control of seepage losses ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that reservoir was not full at the beginning None of these demand cannot be met by inflow both (A) and (B) reservoir was not full at the beginning None of these demand cannot be met by inflow both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The optimum depth of kor watering for a rice crop, is 17.5 cm 23.0 cm 13.5 cm 19.0 cm 17.5 cm 23.0 cm 13.5 cm 19.0 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hydraulic jump is generally formed when a stream moving with A hyper-critical velocity meets a stream moving with a hyper-critical velocity A sub-critical velocity meets a stream moving with a hyper-critical velocity A hyper-critical velocity meets a stream moving with a critical velocity A hyper-critical velocity meets a stream moving with a sub-critical velocity A hyper-critical velocity meets a stream moving with a hyper-critical velocity A sub-critical velocity meets a stream moving with a hyper-critical velocity A hyper-critical velocity meets a stream moving with a critical velocity A hyper-critical velocity meets a stream moving with a sub-critical velocity ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The scour depth D of a river during flood, may be calculated from the Lacey's equation D = 0.47 (Q/f)2/3 D = 0.47 (Q/f)1/2 D = 0.47 (Q/f) D = 0.47 (Q/f)1/3 D = 0.47 (Q/f)2/3 D = 0.47 (Q/f)1/2 D = 0.47 (Q/f) D = 0.47 (Q/f)1/3 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a chute spillway, the flow is usually critical super critical uniform subcritical critical super critical uniform subcritical ANSWER DOWNLOAD EXAMIANS APP