MGVCL Exam Paper (30-07-2021 Shift 2)
Which of the following does the term 'feeder automation' include?

automatic reclosing
All of these
substation reactive power control
feeder remote point voltage control

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In a test by Murray loop for ground fault on 600 m of cable having a resistance of 1.5 Ω/km, the faulty cable is looped with a sound cable of the same length and area of cross section. If the ratio of the other two arms of the testing network at balance is 3 : 1, find the distance of the fault from the testing end of cables.

400 m
300 m
100 m
200 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In the context of smart meters, the term 'SMETS' stand for

Standard Metering Equipment Technical Specifications
Standard Monitoring Equipment Technical Specifications
Smart Monitoring Equipment Technical Specifications
Smart Metering Equipment Technical Specifications

ANSWER DOWNLOAD EXAMIANS APP