Mass Transfer
Make up water is supplied during cooling tower operation to compensate for water losses due to

All of these
Evaporation
Entrainment
Blowdown

ANSWER DOWNLOAD EXAMIANS APP

Mass Transfer
For water-ethanol system, the minimum reflux ratio

Is computed from the intercept of the operating line
Is the optimum reflux ratio
Cannot be computed
Is computed from the slope of the upper operating line that is tangent to the equilibrium curve

ANSWER DOWNLOAD EXAMIANS APP