Mass Transfer Make up water is required in a cooling tower to replace the water lost by Drift Blowdown and leakage Evaporation All of these Drift Blowdown and leakage Evaporation All of these ANSWER DOWNLOAD EXAMIANS APP
Mass Transfer Heat load in a cooling tower Neither A nor B Both A & B Is equal to the number of kg, of water circulated times the cooling range Means the amount of heat thrown away (KCal/hr.) by the cooling tower Neither A nor B Both A & B Is equal to the number of kg, of water circulated times the cooling range Means the amount of heat thrown away (KCal/hr.) by the cooling tower ANSWER DOWNLOAD EXAMIANS APP
Mass Transfer During dehumidification of unsaturated air wet bulb temperature & partial pressure of vapor are not constant. However, during evaporative cooling process with recirculated water supply, the __________ remains constant. Relative humidity Partial pressure of water vapor Wet bulb temperature None of these Relative humidity Partial pressure of water vapor Wet bulb temperature None of these ANSWER DOWNLOAD EXAMIANS APP
Mass Transfer When the psychometric ratio is __________ then the adiabatic saturation temperature and wet bulb temperature becomes equal. < 1 1 ? > 1 < 1 1 ? > 1 ANSWER DOWNLOAD EXAMIANS APP
Mass Transfer Absorption (liquid-gas system) with evolution of heat as compared to isothermal absorption results in All of these Decreased solute solubility Large number of trays Large minimum liquid to gas (L/G) ratio All of these Decreased solute solubility Large number of trays Large minimum liquid to gas (L/G) ratio ANSWER DOWNLOAD EXAMIANS APP
Mass Transfer For experimental determination of mass transfer co-efficient by wetted wall tower, the mass transfer area is Calculated Known Not required Unknown Calculated Known Not required Unknown ANSWER DOWNLOAD EXAMIANS APP