Industrial Engineering and Production Management Routing Determines the programme for the operations Is concerned with starting of processes Prescribes the sequence of operations to be followed Regulates the progress of job through various processes Determines the programme for the operations Is concerned with starting of processes Prescribes the sequence of operations to be followed Regulates the progress of job through various processes ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Actual performance of a task is called None of these An event A duration An activity None of these An event A duration An activity ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The essential condition for the decompression of an activity is that The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM > DAM CAM = DAM There is no such criterion CAM < DAM CAM > DAM CAM = DAM There is no such criterion CAM < DAM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bar charts are suitable for Large projects Major works All of these Minor works Large projects Major works All of these Minor works ANSWER DOWNLOAD EXAMIANS APP