Industrial Engineering and Production Management Routing Determines the programme for the operations Prescribes the sequence of operations to be followed Is concerned with starting of processes Regulates the progress of job through various processes Determines the programme for the operations Prescribes the sequence of operations to be followed Is concerned with starting of processes Regulates the progress of job through various processes ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Actual performance of a task is called None of these An activity An event A duration None of these An activity An event A duration ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The essential condition for the decompression of an activity is that An activity could be decompressed to the maximum extent of its normal time The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time An activity could be decompressed to the maximum extent of its normal time The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM = DAM CAM < DAM CAM > DAM There is no such criterion CAM = DAM CAM < DAM CAM > DAM There is no such criterion ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bar charts are suitable for All of these Minor works Major works Large projects All of these Minor works Major works Large projects ANSWER DOWNLOAD EXAMIANS APP