Industrial Engineering and Production Management Routing Determines the programme for the operations Regulates the progress of job through various processes Is concerned with starting of processes Prescribes the sequence of operations to be followed Determines the programme for the operations Regulates the progress of job through various processes Is concerned with starting of processes Prescribes the sequence of operations to be followed ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Actual performance of a task is called A duration An activity None of these An event A duration An activity None of these An event ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The essential condition for the decompression of an activity is that An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM = DAM There is no such criterion CAM > DAM CAM < DAM CAM = DAM There is no such criterion CAM > DAM CAM < DAM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bar charts are suitable for Minor works All of these Large projects Major works Minor works All of these Large projects Major works ANSWER DOWNLOAD EXAMIANS APP