Industrial Engineering and Production Management The essential condition for the decompression of an activity is that An activity could be decompressed to the maximum extent of its normal time The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time An activity could be decompressed to the maximum extent of its normal time The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Halsey system of wage incentive plan, a worker is Never a loser Paid as per efficiency Ensured of minimum wages Not paid any bonus till his efficiency Never a loser Paid as per efficiency Ensured of minimum wages Not paid any bonus till his efficiency ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Positive slack on a PERT indicates that project is Ahead of schedule Beyond schedule On critical path As per schedule Ahead of schedule Beyond schedule On critical path As per schedule ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as Taylor Plan Rowan Plan Dry work Plan Halsey Premium Plan Taylor Plan Rowan Plan Dry work Plan Halsey Premium Plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if Arrival and waiting times are known and can be grouped to form a waiting line model All variables and constants are known and form a linear equation The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known Complete details of items in, waiting line are known Arrival and waiting times are known and can be grouped to form a waiting line model All variables and constants are known and form a linear equation The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known Complete details of items in, waiting line are known ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) There is no such criterion CAM < DAM CAM = DAM CAM > DAM There is no such criterion CAM < DAM CAM = DAM CAM > DAM ANSWER DOWNLOAD EXAMIANS APP