Industrial Engineering and Production Management A critical activity has Maximum slack Minimum slack Zero slack Average slack Maximum slack Minimum slack Zero slack Average slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In order that linear programming techniques provide valid results Relations between factors must be linear (negative) Only one factor should change at a time, others remaining constant Relations between factors must be linear (positive) Either (A) or (B) Relations between factors must be linear (negative) Only one factor should change at a time, others remaining constant Relations between factors must be linear (positive) Either (A) or (B) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is defined as Normal time + idle time Only normal time for an operation Normal time + idle time + allowances Normal time + allowances Normal time + idle time Only normal time for an operation Normal time + idle time + allowances Normal time + allowances ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In a PERT chart Only important activities should be numbered Only selected activities are numbered All activities should be numbered Only critical activities are numbered Only important activities should be numbered Only selected activities are numbered All activities should be numbered Only critical activities are numbered ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Slack of various events on the critical path in PERT/CPM chart Remain constant Increases continuously Decreases continuously May increase or decrease depending on various factors Remain constant Increases continuously Decreases continuously May increase or decrease depending on various factors ANSWER DOWNLOAD EXAMIANS APP