Bus Type - Known Parameter - Unknown Parameter Load Bus -P, Q - V, phase angle Generator Bus - P, V (magnitude) - Q, Voltage phase angle Slack Bus Voltage - magnitude and phase angle - P, Q
The second generation of smart meters are known as SMETS 2. Full form of SMET is Smart Metering Equipment Technical Specifications. It is with the previous generation known as SMETS 1. SMETS 2 smart meters were introduced in 2018.
The electrostatic stress in a cable is not uniformly distributed. The potential gradient is inversely proportional to the distance from the centre of the cable. Hence, it will be maximum (gmax) at the surface of the conductor and goes on decreasing until it becomes minimum (gmin) at the surface of the sheath. That means electrostatic stress in the dielectric of a cable is maximum at the surface of the conductor and minimum at the surface of the sheath.