GETCO Exam Paper (11-06-2017) In thermal power plants, the pressure in the working fluid cycle is developed by turbine feed water pump superheater condenser turbine feed water pump superheater condenser ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The thickness of insulation provided on the conductor depends upon current rating none current rating and voltage rating voltage rating current rating none current rating and voltage rating voltage rating ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The inductance of a power transmission line increases with increase in spacing between the phase conductors increase in diameter of conductor increase in load current carried by the conductors decrease in line length increase in spacing between the phase conductors increase in diameter of conductor increase in load current carried by the conductors decrease in line length ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The main function of economiser of a boiler plant is to increase life of the boiler reduce fuel consumption increase steam pressure increases steam production increase life of the boiler reduce fuel consumption increase steam pressure increases steam production ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Cells are connected in parallel in order to increase the current capacity efficiency life of the cells voltage rating current capacity efficiency life of the cells voltage rating ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a load duration curve for an integrated power system, the uppermost crest represents the energy contributed by which one of the following? Major thermal stations Non-conventional power stations Peaking hydro or gas turbine stations Base power stations Major thermal stations Non-conventional power stations Peaking hydro or gas turbine stations Base power stations ANSWER DOWNLOAD EXAMIANS APP