GETCO Exam Paper (11-06-2017) In a load duration curve for an integrated power system, the uppermost crest represents the energy contributed by which one of the following? Non-conventional power stations Major thermal stations Peaking hydro or gas turbine stations Base power stations Non-conventional power stations Major thermal stations Peaking hydro or gas turbine stations Base power stations ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Arc in a circuit breaker is interrupted at minimum voltage maximum voltage zero current maximum current minimum voltage maximum voltage zero current maximum current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Kirchhoff's laws are valid for passive time invariant circuits linear circuits only both linear and nonlinear circuits nonlinear circuits only passive time invariant circuits linear circuits only both linear and nonlinear circuits nonlinear circuits only ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Fiber-optic cables are used in power system applications mainly for all SCADA communication between power station and load control centre communication between power station and substation all SCADA communication between power station and load control centre communication between power station and substation ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In thermal power plants, the pressure in the working fluid cycle is developed by superheater feed water pump turbine condenser superheater feed water pump turbine condenser ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The rate of rise of restriking voltage depends on the type of circuit breaker the inductance of the system only both inductance and capacitance of the system the capacitance of the system only the type of circuit breaker the inductance of the system only both inductance and capacitance of the system the capacitance of the system only ANSWER DOWNLOAD EXAMIANS APP