GETCO Exam Paper (11-06-2017) In a load duration curve for an integrated power system, the uppermost crest represents the energy contributed by which one of the following? Base power stations Peaking hydro or gas turbine stations Major thermal stations Non-conventional power stations Base power stations Peaking hydro or gas turbine stations Major thermal stations Non-conventional power stations ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) For the protection of power system against travelling waves, we use surge diverters None of these overhead ground wires earthing screens surge diverters None of these overhead ground wires earthing screens ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a 3-phase supply, floating neutral is undesirable because it may result in _____ across the load unequal line voltage none high voltage low voltage unequal line voltage none high voltage low voltage ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The main function of economiser of a boiler plant is to increase life of the boiler increases steam production reduce fuel consumption increase steam pressure increase life of the boiler increases steam production reduce fuel consumption increase steam pressure ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Lamps in street lighting are all connected in parallel series series-parallel end-to-end parallel series series-parallel end-to-end ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The power factor of an open ended cable can be improved by decreasing the capacitance increasing the capacitance increasing the insulation resistance increasing the conductor resistance decreasing the capacitance increasing the capacitance increasing the insulation resistance increasing the conductor resistance ANSWER DOWNLOAD EXAMIANS APP