GETCO Exam Paper (11-06-2017) In hydropower station what is an enlarge body of water just above the intake and used as a regulating reservoir, called Forebay Spilways Reservoir Penstock Forebay Spilways Reservoir Penstock ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) To improve the power factor in three phase circuits, the capacitor bank is connected in delta to make capacitance very small the connection elegant capacitance calculation elegant the power factor correction more effective capacitance very small the connection elegant capacitance calculation elegant the power factor correction more effective ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The Mid Day meal scheme was launched on August 15, 1995 August 15, 2001 August 15, 1992 August 15, 2000 August 15, 1995 August 15, 2001 August 15, 1992 August 15, 2000 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) For the protection of power system against travelling waves, we use None of these earthing screens overhead ground wires surge diverters None of these earthing screens overhead ground wires surge diverters ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The efficiency of a nuclear power plant is less than that of a conventional fuel fired thermal plant because of less rejection of heat in the condenser higher pressure conditions low temperature and pressure conditions higher temperature conditions less rejection of heat in the condenser higher pressure conditions low temperature and pressure conditions higher temperature conditions ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In air blast circuit breaker resistance switching is used to control the CB operating time damp out the fast transient change the fault current power factor reduce the magnitude of fault current control the CB operating time damp out the fast transient change the fault current power factor reduce the magnitude of fault current ANSWER DOWNLOAD EXAMIANS APP