GETCO Exam Paper (11-06-2017) In hydropower station what is an enlarge body of water just above the intake and used as a regulating reservoir, called Spilways Forebay Penstock Reservoir Spilways Forebay Penstock Reservoir ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Steady state stability of a power system is improved by using double circuit line instead of single circuit line reducing fault clearing time single pole switching decreasing generator inertia using double circuit line instead of single circuit line reducing fault clearing time single pole switching decreasing generator inertia ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a 3-phase, 4-wire cable the cross sectional area of neutral conductor is double the area of phase conductor half of the area of phase conductor equal to the area of phase conductor 1.5 times the area of phase conductor double the area of phase conductor half of the area of phase conductor equal to the area of phase conductor 1.5 times the area of phase conductor ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Answer as per answer key provided is “double the area of phase conductor”. But neutral wire can be half of phase.
GETCO Exam Paper (11-06-2017) The efficiency of solar cell is about 0.4 0.25 0.6 0.15 0.4 0.25 0.6 0.15 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Sorry, she can't come to the phone. She _____a bath is having has having have is having has having have ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Give synonym: Cease Begin Dull Create Stop Begin Dull Create Stop ANSWER DOWNLOAD EXAMIANS APP