SSC JE Electrical 2019 with solution SET-2
In the salient pole of the phase synchronous machine, the rotor will have

Larger diameter, shorter axial length
Larger diameter, larger axial length
Smaller diameter, smaller axial length
Smaller diameter, larger axial length

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

SSC JE Electrical 2019 with solution SET-2
The scheduled speed of a train is______

Always less than the average speed
Always greater than the average speed
Equal to average speed
Equal to maximum speed

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

SSC JE Electrical 2019 with solution SET-2
While estimating domestic wiring cost, if the length of the PVC conduit required is 62 meters, then what is the length of the cable required?

100 meters
186 meters
62 meters
124 meters

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP