Surveying In the cross-section method of indirect contouring, the spacing of cross-sections depends uponi) contour intervalii) scale of planiii) characteristics of groundThe correct answer is (i), (ii) and (iii) (i) and (ii) (ii) and (iii) only (i) (i), (ii) and (iii) (i) and (ii) (ii) and (iii) only (i) ANSWER DOWNLOAD EXAMIANS APP
Surveying With standard meridian as 82° 30' E the standard time at longitude 90° E is 8 h 30 m. The local mean time at the place will be 8 h 00 m 9 h 00 m 7 h 30 m 7 h 00 m 8 h 00 m 9 h 00 m 7 h 30 m 7 h 00 m ANSWER DOWNLOAD EXAMIANS APP
Surveying In direct method of contouring, the process of locating or identifying points lying on a contour is called horizontal control ranging vertical control centring horizontal control ranging vertical control centring ANSWER DOWNLOAD EXAMIANS APP
Surveying The product of the distances of plumb point and horizon point of a vertical photograph from its principal point, is 3f2 2f2 ½f f2 3f2 2f2 ½f f2 ANSWER DOWNLOAD EXAMIANS APP
Surveying The Polaris describes a small circle round the pole whose radius is approximately 1° 3° 2° 4° 1° 3° 2° 4° ANSWER DOWNLOAD EXAMIANS APP
Surveying The allowable length of an offset depends upon the method of setting out the perpendiculars and nature of ground scale of plotting All of these degree of accuracy required method of setting out the perpendiculars and nature of ground scale of plotting All of these degree of accuracy required ANSWER DOWNLOAD EXAMIANS APP