MGVCL Exam Paper (30-07-2021 Shift 2)
In the context of smart meters, the term 'SMETS' stand for

Smart Monitoring Equipment Technical Specifications
Smart Metering Equipment Technical Specifications
Standard Metering Equipment Technical Specifications
Standard Monitoring Equipment Technical Specifications

ANSWER DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In a test by Murray loop for ground fault on 600 m of cable having a resistance of 1.5 Ω/km, the faulty cable is looped with a sound cable of the same length and area of cross section. If the ratio of the other two arms of the testing network at balance is 3 : 1, find the distance of the fault from the testing end of cables.

400 m
100 m
200 m
300 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Consider the following statements associated with Buchholz's relays.
Statement 1: Buchholz's relay is a current operated device.
Statement 2 : Buchholz's relay is placed between the transformer tank and the conservator.

Both Statement 1 and Statement 2 are TRUE
Both Statement 1 and Statement 2 are FALSE
Statement 1 is FALSE and Statement 2 is TRUE
Statement 1 is TRUE and Statement 2 is FALSE

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
The magnitude of the generator earth-fault current is limited by

inserting suitable resistance in neutral grounding circuit
inserting the stabilizing resistance in series with the relay
using higher rating CTs
controlling field exciter

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP