RCC Structures Design
In testing a pile by load test, pile platform is loaded with one and half times the design load and a maximum settlement is noted. The load is gradually removed and the consequent rebound is measured. For a safe pile, the net settlement (i.e. total settlement minus rebound) per tonne of test load should not exceed

25 mm
15 mm
10 mm
20 mm

ANSWER DOWNLOAD EXAMIANS APP

RCC Structures Design
Pick up the assumption for the design of a pre-stressed concrete member from the following:

All listed here
During deformation limits, Hook's law is equally applicable to concrete as well as to steel
A transverse plane section remains a plane after bending
Variation of stress in reinforcement due to changes in external loading is negligible

ANSWER DOWNLOAD EXAMIANS APP