MGVCL Exam Paper (30-07-2021 Shift 2)
In a single phase energy meter, the shunt electromagnet is energized by a ____of ____

pressure coil, thin wire of more turns
pressure coil, thick wire of few turns
current coil, thin wire of more turns
current coil, thick wire of few turns

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Which one of these is not a monitoring and diagnostic test for transformer oil?

Furanic Compound Analysis
Volatility Level Analysis
Dissolved Metals Analysis
Dissolved Gas Analysis

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Which one of the following statement with respect to Aerial Bunched Cables (ABC) system is TRUE?

The overall cost of the ABC system is very high as compared to the bare conductor system.
ABC system is not suitable for rural electrification which are situated in difficult terrain, hills, forests and coastal areas.
ABC system requires more clearance, insulators and high maintenance.
ABC system totally eliminates the fault on lines and thereby improving the quality of supply.

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP