DGVCL Exam Paper (11-12-2011) In a power plant, a reserve generating capacity which is not in service but is in operation is known as Hot reserve Cold reserve Spinning reserve Firm power Hot reserve Cold reserve Spinning reserve Firm power ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If the excitation of a synchronous generator fails, it acts as a Synchronous generator Induction generator Induction motor Synchronous motor Synchronous generator Induction generator Induction motor Synchronous motor ANSWER EXPLANATION DOWNLOAD EXAMIANS APP if excitation of synchronous generator fails, operate as induction motor
DGVCL Exam Paper (11-12-2011) The insulation coordination for UHV lines (above 500 kV) is done based on Switching surges Lightning and switching surges Lightning surges Voltage level of the line Switching surges Lightning and switching surges Lightning surges Voltage level of the line ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The efficiency of a transformer at full load, 0.8 p.f. lag is 90%. Its efficiency at full load, 0.8 p.f. lead will be More than 90% Less than 90% 90 % 80 % More than 90% Less than 90% 90 % 80 % ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Efficiency= output power/input powerefficiency = (v*i*cosφ)/((v*i*cosφ)+(x² Pc)+(Pi)) x=fractional part of full load
DGVCL Exam Paper (11-12-2011) People can interact with each other through any part of the world through video conferencing using Speaker Joystick Webcam Scanner Speaker Joystick Webcam Scanner ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If the fault current is 2000 A, the relay plug setting is 50% and the CT ratio is 400/5, the plug setting multiple will be 50 10 15 25 50 10 15 25 ANSWER DOWNLOAD EXAMIANS APP