DGVCL Exam Paper (11-12-2011) In a power plant, a reserve generating capacity which is not in service but is in operation is known as Firm power Cold reserve Spinning reserve Hot reserve Firm power Cold reserve Spinning reserve Hot reserve ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) At time t= 0+ , with zero initial condition, which of the following acts as a short circuit? Conductor Voltage source Resistor Capacitor Conductor Voltage source Resistor Capacitor ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Fot fast load flow calculations, the best method is Gauss-Siedal De-coupled method Newton-Raphson Approximate method Gauss-Siedal De-coupled method Newton-Raphson Approximate method ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The best location of the power factor correction equipment to be installed in the transmission line is at The receiving end Any place The sending end Middle of the line The receiving end Any place The sending end Middle of the line ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Rated making capacity of a ciruit breaker is equal to 2.55 X rated symmetrical breaking capacity √2 X rated symmetrical breaking capacity Rated symmetrical breaking capacity 1.11 X rated symmetrical breaking capacity 2.55 X rated symmetrical breaking capacity √2 X rated symmetrical breaking capacity Rated symmetrical breaking capacity 1.11 X rated symmetrical breaking capacity ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) A 3 phase, 6 pole induction motor operates on 440 V, 50 Hz, supply. If the actual speed of the motor is 960 rpm the slip will be 6 % 4 % 5 % 0.4 % 6 % 4 % 5 % 0.4 % ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Ns = 120f/PSlip=(Ns-Nr)/NsNs = 1000 and Nr = 960 from equation of slip, S = (1000-960)/1000S = 0.04 or 4%