DGVCL Exam Paper (11-12-2011) In a power plant, a reserve generating capacity which is not in service but is in operation is known as Firm power Spinning reserve Hot reserve Cold reserve Firm power Spinning reserve Hot reserve Cold reserve ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The transient stability of a power system can be improved by Phase shifting transformer Excitation control Single pole switching of circuit breakers Increasing the turbine valve opening Phase shifting transformer Excitation control Single pole switching of circuit breakers Increasing the turbine valve opening ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If the voltage at the two ends of a line are 132 kV, and its reactance is 40 Ω, the stability limit of the line is 217.8 MW 435.6 MW 251.5 MW 500 MW 217.8 MW 435.6 MW 251.5 MW 500 MW ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The insulation coordination for UHV lines (above 500 kV) is done based on Voltage level of the line Lightning surges Lightning and switching surges Switching surges Voltage level of the line Lightning surges Lightning and switching surges Switching surges ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Which lightning stroke is most dangerous? Direct stroke on ground wire Direct stoke on tower top Direct stroke on line conductor Indirect stroke on conductor Direct stroke on ground wire Direct stoke on tower top Direct stroke on line conductor Indirect stroke on conductor ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If the fault current is 2000 A, the relay plug setting is 50% and the CT ratio is 400/5, the plug setting multiple will be 15 50 25 10 15 50 25 10 ANSWER DOWNLOAD EXAMIANS APP