DGVCL Exam Paper (11-12-2011) In a power plant, a reserve generating capacity which is not in service but is in operation is known as Hot reserve Firm power Spinning reserve Cold reserve Hot reserve Firm power Spinning reserve Cold reserve ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If the dielectric strength of the medium between the contacts builds up more rapidly than the restriking voltage the arc will Increase in size Extinguish Restrike Decrease in size Increase in size Extinguish Restrike Decrease in size ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If the voltage at the two ends of a line are 132 kV, and its reactance is 40 Ω, the stability limit of the line is 435.6 MW 251.5 MW 217.8 MW 500 MW 435.6 MW 251.5 MW 217.8 MW 500 MW ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Transposition of transmission line is done to Reduce line loss Balance line voltage drop Reduce corona Reduce skin effect Reduce line loss Balance line voltage drop Reduce corona Reduce skin effect ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) A Mho relay is a Voltage restrained directional relay Directional restrained over voltage relay Voltage controlled over current relay Directional restrained over current relay Voltage restrained directional relay Directional restrained over voltage relay Voltage controlled over current relay Directional restrained over current relay ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The circuit breaker generally used in railway traction is Vacuum CB Minimum Oil CB Air break CB Bulk Oil CB Vacuum CB Minimum Oil CB Air break CB Bulk Oil CB ANSWER DOWNLOAD EXAMIANS APP