DGVCL Exam Paper (11-12-2011) In a power plant, a reserve generating capacity which is not in service but is in operation is known as Hot reserve Cold reserve Spinning reserve Firm power Hot reserve Cold reserve Spinning reserve Firm power ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The efficiency of a transformer at full load, 0.8 p.f. lag is 90%. Its efficiency at full load, 0.8 p.f. lead will be Less than 90% 80 % 90 % More than 90% Less than 90% 80 % 90 % More than 90% ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Efficiency= output power/input powerefficiency = (v*i*cosφ)/((v*i*cosφ)+(x² Pc)+(Pi)) x=fractional part of full load
DGVCL Exam Paper (11-12-2011) A fuse is inserted in Both phased and neutral wire Earth continuity conductor Neutral wire Phase wire Both phased and neutral wire Earth continuity conductor Neutral wire Phase wire ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The mutual inductance between two unity coupled coils of 9 H and 4 H is 36 H 6 H 13 H 2.2 H 36 H 6 H 13 H 2.2 H ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The circuit breaker generally used in railway traction is Bulk Oil CB Air break CB Minimum Oil CB Vacuum CB Bulk Oil CB Air break CB Minimum Oil CB Vacuum CB ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) In carrier current protection, the purpose of the wave trap is for Trapping high frequency waves entering into generator/transformer unit. Trapping power frequency waves Tripping fault current All of these Trapping high frequency waves entering into generator/transformer unit. Trapping power frequency waves Tripping fault current All of these ANSWER DOWNLOAD EXAMIANS APP