DGVCL Exam Paper (11-12-2011) If a relay fails to operate inspite of a fault in its own zone of protection, it is said to Reach Under reach Over reach Pick up Reach Under reach Over reach Pick up ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Hysteresis in an instrument means The inaccuracy due to change in temperature The repeatability of the instrument The change in the same reading when the input is first increased and then decreased The reliability of the instrument The inaccuracy due to change in temperature The repeatability of the instrument The change in the same reading when the input is first increased and then decreased The reliability of the instrument ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) It is difficult interrupt a capacitive current because Stored energy in the capacitor is very high The restriking voltage can be high It has a leading power factor Current magnitude is very small Stored energy in the capacitor is very high The restriking voltage can be high It has a leading power factor Current magnitude is very small ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) In a power plant, a reserve generating capacity which is not in service but is in operation is known as Spinning reserve Firm power Hot reserve Cold reserve Spinning reserve Firm power Hot reserve Cold reserve ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Buchholz relay causes Alarm for both major and minor faults Tripping for minor faults and alarm for major faults Tripping for both major and minor faults Tripping for major faults and alarm for minor faults Alarm for both major and minor faults Tripping for minor faults and alarm for major faults Tripping for both major and minor faults Tripping for major faults and alarm for minor faults ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The picture on the monitor of a computer is made up of tiny coloured dots called Points Spots Pixels Icons Points Spots Pixels Icons ANSWER DOWNLOAD EXAMIANS APP