DGVCL Exam Paper (11-12-2011) If a relay fails to operate inspite of a fault in its own zone of protection, it is said to Under reach Pick up Reach Over reach Under reach Pick up Reach Over reach ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) All the peripheral devices connected to a computer require power to work. Which of the following voltages is required for the motherboard to work? DC Positive cycle of sine wave Negative cycle of sine wave AC DC Positive cycle of sine wave Negative cycle of sine wave AC ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) DC series motors are best suited for traction work because Its torque is proportional to the square of the armature current and speed is inversely proportional to torque Torque and speed are proportional to the square of the armature current Its torque is proportional to the square of the armature current and speed is directional proporational to torque Torque and speed are inversely proportional to the square of the armature current Its torque is proportional to the square of the armature current and speed is inversely proportional to torque Torque and speed are proportional to the square of the armature current Its torque is proportional to the square of the armature current and speed is directional proporational to torque Torque and speed are inversely proportional to the square of the armature current ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Torque in d.c motor = k* φ * IaIn series motor φ α IaTα I²N α 1/φN α 1/T
DGVCL Exam Paper (11-12-2011) Ybus used in power flow studies and Zbus used in short circuit studies Are transpose of each other Are inverse of each other Have no inter relation Are the same Are transpose of each other Are inverse of each other Have no inter relation Are the same ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Different computers are connected to a LAN by a cable and a Interface card Special wires Modem Telephone line Interface card Special wires Modem Telephone line ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The best location of the power factor correction equipment to be installed in the transmission line is at Middle of the line The receiving end The sending end Any place Middle of the line The receiving end The sending end Any place ANSWER DOWNLOAD EXAMIANS APP