• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

System Analysis and Design

System Analysis and Design
In a _____ one module of the new information system is activates at a time.

Phased Conversion
Success factors
CASE tool
System Development Life Cycle

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
During the system study, the executive vice-president and the other managers exercise their responsibility of

organizing
directing
planning
controlling

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
Any data that are entered into the computer, for the first time, will go through the process of

None of these
System testing
String testing
Validation
Sequential testing

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
A hierarchical chart that divides a large program into modules, in which greater details is designed in successively lower programming levels, is called a

Scheme
None of these
All of these
Structure
sub-schema

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
Programmers refer to the items needed to reach a problem's goal as the _____

Out put
Input
Processing
None of these
Purpose

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
The longest method of conversion is

direct
pilot
parallel
phased
None of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON System Analysis and Design

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑