Power Systems If the penalty factor of a plant is unity, its incremental transmission loss is None of these 1 0 -1 None of these 1 0 -1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The total number of strands(N) is concentrically stranded cable with total annular space filled with strands of uniform diameter is given by (if x is number of layers) N = 3x²+3x+1 N = 3x²-2x+1 N = 3x²-3x+1 N = 3x²-6x+1 N = 3x²+3x+1 N = 3x²-2x+1 N = 3x²-3x+1 N = 3x²-6x+1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems An unloaded generator with a pre-fault voltage 1 pu has the following sequence impedance: Z0 = j 0.15 pu, Z1 = Z2 = j 0.25 pu The neutral is grounded with a reactance of 0.05 pu. The fault current in pu for single line to ground fault is 4.28 pu 7.25 pu 2.5 pu 3.75 pu 4.28 pu 7.25 pu 2.5 pu 3.75 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The value of diversity factor is 1 less than 1 greater than 1 0 1 less than 1 greater than 1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 20. 7. 5. 3. 20. 7. 5. 3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When bundle conductor are used in place of single conductor the effective inductance and capacitance will respectively decrease and remain unaffected. decrease and increase. increase and decrease. increase and remain unaffected. decrease and remain unaffected. decrease and increase. increase and decrease. increase and remain unaffected. ANSWER DOWNLOAD EXAMIANS APP