Power Systems If the penalty factor of a plant is unity, its incremental transmission loss is 1 -1 0 None of these 1 -1 0 None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gross head of an hydroelectric power station is all of above. the height of water level in the river where the tail race is provided. the height of water level in the river where the storage is provided. the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the tail race is provided. the height of water level in the river where the storage is provided. the difference of water level between the level in storage and tail race. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two identical synchronous machines having same inertia constant are connected in parallel and swinging together. The effective inertia constant is 4 MJ/MVA. Then each machine has inertia constant of 4 MJ/MVA 16 MJ/MVA 8 MJ/MVA 2 MJ/MVA 4 MJ/MVA 16 MJ/MVA 8 MJ/MVA 2 MJ/MVA ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with reaction and adjustable vanes runners is Impeller Kaplan Francis Pelton Impeller Kaplan Francis Pelton ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has impedance of (0.005 + j0.05) pu. Find the line at which maximum value of negative DC off set current is produced, if it is applied with Vm cosωt? 2.63 msec 4.68 msec 9.68 1.47 msec 2.63 msec 4.68 msec 9.68 1.47 msec ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power output from an hydroelectric plants depend on type of turbine, type of dam and type of catchment area. discharge, system efficiency. type of dam, head, system efficiency. type of dam, type of catchment area and discharge. type of turbine, type of dam and type of catchment area. discharge, system efficiency. type of dam, head, system efficiency. type of dam, type of catchment area and discharge. ANSWER DOWNLOAD EXAMIANS APP