Power Systems If the penalty factor of a plant is unity, its incremental transmission loss is 1 None of these -1 0 1 None of these -1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under excited Synchronous phase modifier works as any of the above shunt reactor shunt capacitor series capacitor any of the above shunt reactor shunt capacitor series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Communications lines are treated as any of the above short transmission lines medium transmission lines long transmission lines any of the above short transmission lines medium transmission lines long transmission lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are high. both operating and initial cost are low. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are high. both operating and initial cost are low. operating cost is high and initial cost is low. operating cost is low and initial cost is high. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is compensated with shunt capacitance Csh. After shunt compensation surge impedance loading will increases None of these remains unaffected decreases increases None of these remains unaffected decreases ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 1-phase transmission line has an impedance (3+4j) Ω . Find the power factor of the load for achieving maximum and zero voltage regulation? 0.6 lag and 0.8 lead 0.6 lag and 0.6 lead 0.8 lag and 0.6 lead 0.8 lag and 0.8 lead 0.6 lag and 0.8 lead 0.6 lag and 0.6 lead 0.8 lag and 0.6 lead 0.8 lag and 0.8 lead ANSWER DOWNLOAD EXAMIANS APP