No of disc required for 11 kV transmission line = 1 disc Since the transmission line is 3-phase, therefore, the number of discs required for a single-pole will be 3. Total no. of poles = 80 No of disc = 3 × 80 = 240
Indian Electricity Rules specify that the maximum load on a power sub-circuit should not exceed 3000 watts and the number of outlets should be limited to two.
Form factor: The ratio of r.m.s (or effective) value to average value is the form factor (Kf) of the Waveform. It has used in voltage generation and instrument correction factors. Peak factor: The ratio of maximum value to the r.m.s value is the peak factor (Kp) of the waveform. Form Factor × Peak Factor = (RMS Value / Average Value) * (Maximum Value / RMS Value) = Maximum Value / Average Value
The size of the conduit is 62 meters. In conduit, there is a 2-phase wire and 1 neutral wire. Therefore the total number of conducting wire is 3 in a conduit Total length of cable = 62 × 3 = 186 meters.
While estimating the overhead lines, the first and last pole is always earth connected and after every 3rd electrical pole, the fourth pole is earthed. Therefore, the approximate number of required ground set = 4