Surveying Horizontal distances obtained by thermometric observations do not require slope and tension corrections require slope and tension corrections require tension correction require slope correction do not require slope and tension corrections require slope and tension corrections require tension correction require slope correction ANSWER DOWNLOAD EXAMIANS APP
Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are(i) Levelling(ii) Orientation(iii) CenteringThe correct sequence of these operations is (iii), (i), (ii) (ii), (iii), (i) (i), (ii), (iii) (i), (iii), (ii) (iii), (i), (ii) (ii), (iii), (i) (i), (ii), (iii) (i), (iii), (ii) ANSWER DOWNLOAD EXAMIANS APP
Surveying Size of a theodolite is specified by the diameter of upper plate the diameter of vertical circle the length of telescope the diameter of lower plate the diameter of upper plate the diameter of vertical circle the length of telescope the diameter of lower plate ANSWER DOWNLOAD EXAMIANS APP
Surveying Sidereal day Is the period of time taken by the earth in making a complete rotation with reference to stars Is divided into the conventional hours, minutes and seconds Is slightly shorter than an ordinary solar day All listed here Is the period of time taken by the earth in making a complete rotation with reference to stars Is divided into the conventional hours, minutes and seconds Is slightly shorter than an ordinary solar day All listed here ANSWER DOWNLOAD EXAMIANS APP
Surveying The process of turning the telescope about the vertical axis in horizontal plane is known as transiting swinging reversing plunging transiting swinging reversing plunging ANSWER DOWNLOAD EXAMIANS APP
Surveying The elevation of the star at elongation is obtained by sin α = sin φ sec δ sin α = cos φ cosec δ sin α = cos φ sec δ sin α = sin φ cosec δ sin α = sin φ sec δ sin α = cos φ cosec δ sin α = cos φ sec δ sin α = sin φ cosec δ ANSWER DOWNLOAD EXAMIANS APP