Irrigation Engineering Groynes are generally built Perpendicular to the bank Inclined up stream up to 30° All listed here Inclined downstream up to 30° Perpendicular to the bank Inclined up stream up to 30° All listed here Inclined downstream up to 30° ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the head recovered to the head put in, is known as Flexibility Sensitivity Modular limit Efficiency Flexibility Sensitivity Modular limit Efficiency ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called gross speed operating speed design speed rated speed gross speed operating speed design speed rated speed ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a diversion head works of a canal from a river, is To remove silt To control floods To store water To raise water level To remove silt To control floods To store water To raise water level ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A divide wall is provided At an inclination to the axis of weir At right angle to the axis of weir Parallel to the axis of weir and upstream of it Parallel to the axis of weir and downstream of it At an inclination to the axis of weir At right angle to the axis of weir Parallel to the axis of weir and upstream of it Parallel to the axis of weir and downstream of it ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The field capacity of a soil is 25%, its permanent wilting point is 15% and specific dry unity weight is 1.5. If the depth of root zone of a crop, is 80 cm, the storage capacity of the soil, is 14 cm 10 cm 8 cm 12 cm 14 cm 10 cm 8 cm 12 cm ANSWER DOWNLOAD EXAMIANS APP