GETCO Exam Paper (30-11-2008) The symmetrical components are used in fault analysis because the number of equations become lesser the sequence networks do not have mutual couplings the result are in terms of symmetrical components none of these the number of equations become lesser the sequence networks do not have mutual couplings the result are in terms of symmetrical components none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If the +Ve, -Ve & zero sequence reactances of an elements of a power system are 0.3, 0.3 & 0.8 p.u. respectively, the element would be synchronous motor transmission line static load synchronous generator synchronous motor transmission line static load synchronous generator ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) A material best suited for manufacturing of fuse wire is silver aluminium zinc copper silver aluminium zinc copper ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Rewirable fuse has _____ time-current characteristic square none of these inverse linear square none of these inverse linear ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The delay fuses are used for protection of fluorescent lamp none of these motors light circuits fluorescent lamp none of these motors light circuits ANSWER DOWNLOAD EXAMIANS APP