Irrigation Engineering For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.) 0.5 hw 0.75 hw 1.50 hw 1.25 hw 0.5 hw 0.75 hw 1.50 hw 1.25 hw ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods of applying water may be used on rolling land ? free flooding furrow flooding check flooding boarder flooding free flooding furrow flooding check flooding boarder flooding ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If water table is comparatively high, the irrigation canal becomes useless, due to Water logging of the cultivated areas Uncertain water demand Large amount of seepage All of these Water logging of the cultivated areas Uncertain water demand Large amount of seepage All of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The saturation line is the line up to which banks get saturated after the canal runs for some time. The saturation gradient in ordinary loam soil, is generally 0.20902777777778 0.084027777777778 0.12569444444444 0.16736111111111 0.20902777777778 0.084027777777778 0.12569444444444 0.16736111111111 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to Plant factor Utilization factor Both load and plant factor Load factor Plant factor Utilization factor Both load and plant factor Load factor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be syphon syphon aqueduct superpassage aqueduct syphon syphon aqueduct superpassage aqueduct ANSWER DOWNLOAD EXAMIANS APP