Irrigation Engineering For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.) 0.5 hw 1.25 hw 0.75 hw 1.50 hw 0.5 hw 1.25 hw 0.75 hw 1.50 hw ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Assertion A : To estimate the rainfall over a catchment, the number of raingauges required per unit area is large for hilly areas.Reason R : Rainfall gradient is steep.Select your correct answer according to the coding system given below : Both A and R are true but R is not the correct explanation of A Both A and R are true and R is the correct explanation of A A is true but R is false A is false but R is true Both A and R are true but R is not the correct explanation of A Both A and R are true and R is the correct explanation of A A is true but R is false A is false but R is true ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the optimum depth of kor watering for a crop is 15.12 cm, the outlet factor for the crop for four week period in hectares per cumec, is 1700 1400 1600 1500 1700 1400 1600 1500 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a diversion head works of a canal from a river, is To remove silt To raise water level To store water To control floods To remove silt To raise water level To store water To control floods ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The relation between probability (P) and recurrence interval (T) is given by P/T = 1 P/T2 = 1 PT2 = 1 PT = 1 P/T = 1 P/T2 = 1 PT2 = 1 PT = 1 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Tortuosity of a meandering river is always equal to 1 greater than 1 less than or equal to 1 less than 1 equal to 1 greater than 1 less than or equal to 1 less than 1 ANSWER DOWNLOAD EXAMIANS APP