Industrial Engineering and Production Management For material transportation, conveyors are used when the prevailing conditions include Loads are uniform All of the listed here Materials move relatively continuously Routes do not vary Loads are uniform All of the listed here Materials move relatively continuously Routes do not vary ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Routing is essential in the following type of industry Job order industry Assembly industry Process industry Mass production industry Job order industry Assembly industry Process industry Mass production industry ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The basic difference between PERT and CPM is that Guessed times are used in PERT and evaluated times in CPM Costs are considered on CPM only and not in PERT PERT deals with events and CPM with activities Critical path is determined in PERT only Guessed times are used in PERT and evaluated times in CPM Costs are considered on CPM only and not in PERT PERT deals with events and CPM with activities Critical path is determined in PERT only ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Works cost implies Factory expenses Factory cost Primary cost + factory expenses Primary cost Factory expenses Factory cost Primary cost + factory expenses Primary cost ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is _________ the standard time. One-half One-fourth Equal to Twice One-half One-fourth Equal to Twice ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Two alternatives can produce a product. First have a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is 25 75 100 50 25 75 100 50 ANSWER DOWNLOAD EXAMIANS APP