Waste Water Engineering For house drainage minimum gradient is 1 in 400 1 in 60 1 in 80 1 in 10 1 in 400 1 in 60 1 in 80 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For drainage pipes in buildings the test applied before putting them to use, is Straightness test Smoke test Water test All listed here Straightness test Smoke test Water test All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 3 to 5 5 to 10 2 to 3 1 3 to 5 5 to 10 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum diameter of sewers adopted in the designs is 2.0 m 3.0 m 4.0 m 1.0 m 2.0 m 3.0 m 4.0 m 1.0 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer running partially full and hurried with back filled, fails in compression due to Weight of the pipe All listed here Superimposed traffic loads Weight of the back fill Weight of the pipe All listed here Superimposed traffic loads Weight of the back fill ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ‘Cowl’ is provided at First step in manhole Upper end of ventilating column Upper end of the manhole Lower end of ventilating column First step in manhole Upper end of ventilating column Upper end of the manhole Lower end of ventilating column ANSWER DOWNLOAD EXAMIANS APP