Waste Water Engineering For house drainage minimum gradient is 1 in 80 1 in 60 1 in 400 1 in 10 1 in 80 1 in 60 1 in 400 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes All listed here Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes All listed here Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Lateral sewer Sewer outfall Branch sewer House sewer Lateral sewer Sewer outfall Branch sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage All listed here Oil and grease are removed from skimming tanks Floating materials are removed by screening Girt and sand are removed by girt chambers All listed here Oil and grease are removed from skimming tanks Floating materials are removed by screening Girt and sand are removed by girt chambers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sedimentation tank (length L, width B, depth D) the settling velocity of a particle for a discharge Q, is Q/L Q/(L × D) Q/(B × L) Q/(B × D) Q/L Q/(L × D) Q/(B × L) Q/(B × D) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewers, inverted siphon is provided for Four pipes Three pipes One pipe Two pipes Four pipes Three pipes One pipe Two pipes ANSWER DOWNLOAD EXAMIANS APP