Waste Water Engineering For a peak discharge of 0.0157 cumec, with a velocity of 0.9 m/sec, the diameter of the sewer main, is 18 cm 12 cm 15 cm 10 cm 18 cm 12 cm 15 cm 10 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer running partially full and hurried with back filled, fails in compression due to Weight of the back fill Superimposed traffic loads Weight of the pipe All listed here Weight of the back fill Superimposed traffic loads Weight of the pipe All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of minimum hourly flow to the average flow of sewage is 43832 43833 43834 43894 43832 43833 43834 43894 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Scouring occurs at bottom Silting occurs at bottom Neither silting nor scouring occurs at bottom Both silting and scouring occur at bottom Scouring occurs at bottom Silting occurs at bottom Neither silting nor scouring occurs at bottom Both silting and scouring occur at bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewers, inverted siphon is provided for Three pipes Two pipes One pipe Four pipes Three pipes Two pipes One pipe Four pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the diameter of upper circular portion, the overall depth of a standard egg shaped section, is 1.5 D 1.25 D 1.15 D 1.75 D 1.5 D 1.25 D 1.15 D 1.75 D ANSWER DOWNLOAD EXAMIANS APP